Objections to BESS @ Newburn to be submitted by/soon after 01.01.26 to be considered!

  • Home
  • About us
  • Register Here
  • Meetings / Events
  • Petition
  • Media Articles
  • Survey
  • EIA Screening Application
  • Solar Power Plant
  • BESS Newburn App Info
  • BESS Lemington App Info
  • Solar Site Application
  • Community Campaign
  • Contact Us
  • More
    • Home
    • About us
    • Register Here
    • Meetings / Events
    • Petition
    • Media Articles
    • Survey
    • EIA Screening Application
    • Solar Power Plant
    • BESS Newburn App Info
    • BESS Lemington App Info
    • Solar Site Application
    • Community Campaign
    • Contact Us
  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out


Signed in as:

filler@godaddy.com

  • Home
  • About us
  • Register Here
  • Meetings / Events
  • Petition
  • Media Articles
  • Survey
  • EIA Screening Application
  • Solar Power Plant
  • BESS Newburn App Info
  • BESS Lemington App Info
  • Solar Site Application
  • Community Campaign
  • Contact Us

Account

  • My Account
  • Sign out

  • Sign In
  • My Account

PDF Viewer

Demolition Plan

Download PDF

PDF Viewer

Newburn BESS

Download PDF

PDF Viewer

BESS Substation

Download PDF

PDF Viewer

Tree Protection

Download PDF

PDF Viewer

Tree Survey Plan Figure 2

Download PDF

PDF Viewer

Tree Constraints Plan Figure 3

Download PDF

PDF Viewer

Tree Protection Plan Figure 4

Download PDF

PDF Viewer

FIG-Power-Newburn-EcIA-1_0

Download PDF

PDF Viewer

HYD-XX-XX-RP-C-7000

Download PDF

PDF Viewer

Elevations Substation Dimensions

Download PDF

PDF Viewer

Existing Site Sections BESS

Download PDF

PDF Viewer

Existing Site Sections Substation

Download PDF

PDF Viewer

Proposed Site Sections BESS

Download PDF

PDF Viewer

Proposed Site Sections Substation

Download PDF

PDF Viewer

Fencing Plan

Download PDF

PDF Viewer

Equipment Substation

Download PDF

PDF Viewer

Equipment Lighting

Download PDF

PDF Viewer

Newburn-BESS-Retaining-wall-sections

Download PDF

PDF Viewer

Substation Retaining Wall Sections

Download PDF

PDF Viewer

Existing-Site-Sections-Substation-C-D

Download PDF

Copyright © 2025 Walbottle Greenspace - All Rights Reserved.

Powered by

  • Privacy Policy

Dear Walbottle Greenspace Working Group Panel,


Thank you for your email.

Following the announcement from the National Energy System Operator (NESO) that all embedded generation projects will be subject to the Connections Reform and the Gate 2 to Whole Queue Process, the Estate has paused further planning work on the Blucher Solar Park while we await greater clarity on the project’s grid connection prospects and a confirmed connection date.




As part of our planning and public engagement process, we take constructive feedback on board and recognise the importance of community input. If the proposal 